EPRI NP was conditionally endorsed by the U.S. Nuclear Regulatory to note that the NRC revised 10CFR, Part 21 after EPRI published both NP Plant Engineering: Guideline for the Acceptance of Commercial-Grade Items in Nuclear Safety-Related Applications: Revision 1 to EPRI NP and TR-. 5/ NP PBSA. 10CFR21 R1. “Dedication” occurs EPRI NP- and TR,” endorsed by the NRC (RG ).


Epri Np 5652 Pdf

Author:COLLEN MINSON
Language:English, Dutch, Hindi
Country:Dominica
Genre:Academic & Education
Pages:681
Published (Last):24.09.2016
ISBN:490-2-44321-204-1
ePub File Size:18.81 MB
PDF File Size:19.83 MB
Distribution:Free* [*Sign up for free]
Downloads:35676
Uploaded by: PHOEBE

Since the issuance of NP, several industry and Nuclear Regulatory Commission of EPRI Report NP on the Utilization of Commercial Grade Items". Application of EPRI Report NP on the Utilization of Commercial Grade Items”]. Commercial Grade Item (CGI) - A structures, systems, and components. See EPRI reports NP and TR for a more detailed the application of the commercial grade dedication (CGD) process described in EPRI reports.

Related Content Customize your page view by dragging and repositioning the boxes below.

Newsletter

If your company manufactures commercial parts and sells the same spri to the nuclear industry as safety related parts, do those parts have to go through Commercial Grade Dedication? Commercial Grade Dedication CGD Instrumentation, control and monitoring systems in operating nuclear power plants generally utilize analog technology.

The Scope of dedication includes material, electrical and mechanical components located in mild and erpi environment. Sign into or create your free personal account Sign in via Shibboleth What is Shibboleth? These include items such as evaluating the effects of electromagnetic and radio frequency interference on dpri system reliability, the need for software verification and validation, the review of abnormal conditions and events analysis ACEs epdi, as well as overall licensing aspects and the need to increase use of commercial-grade equipment to decrease cost, particularly for safety systems.

For assistance or to subscribe, please contact us:. The requirements for equipment qualification are described in IEEE standards.

Download NRC Letter here. Published by Elsevier Ltd. Westinghouse Nuclear Services P.

Additional Total Quality Management TQM Requirements

Audit Conduct: 1. The audit team reviewed the quality program to ensure compliance with the quality program requirements.

As a result, there are some elements of the program 2 that have not been implemented and they are identified in a Supplier Corrective Action Request to track their completion. The audit team sampled in-process activities, completed documents, and a demonstration job to verify the implementation of the quality program.

There have been no safety related products produced under the existing QA system. Effectiveness of Audited Program: The quality program was reviewed to determine the level of compliance to nuclear industry standards. Additionally, the Quality Assurance Manager is responsible for organizing verification activities, setting training requirements for nuclear certified personnel, facilitating a continual improvement program and conducting the management review of the quality system.

You might also like: CLEOPATRAS DAUGHTER PDF

Each department shall be responsible for issuing and maintaining the certification status of their personnel. This function shall maintain procedures to ensure that the applicable functions review nuclear orders for quality requirements and acknowledge all download orders, requests for quote and customer contracts for nuclear products.

Refer to the flow diagram, Figure 1 of this document. Signature approval either electronic or hand original is interpreted as an acknowledgement that the document is correct and satisfactory.

Paragraph 4. Rev E 7.

Contractors, Procurement, Supply Chain

A unique identification number shall be assigned to each batch and item type. This identification shall accompany the item throughout the processing cycle, from receipt to installation.

When practical, the identification is marked directly on the item. When direct marking is not practical, items are labeled or tagged with identification. Soldering is a special process.

The industry specification IPC-AC Class 2 is used, when applicable, for soldering and soldering quality requirements and acceptability.As cookies are essential to the proper functioning of this site, if you object to their use please exit now. With regard to safety related product, Tyco Electronics US Metrology is viewed as a supplier to the manufacturing function or site that is responsible for the manufacturer of safety-related product.